Tools and Rules:
Basic Equipment Required:
Tie-off ropes, safety harness, long level, ladders,
scaffolding with approved planking, extension cords
with approved ground plugs and electrical services.
Additional Tools:
Metal folding tool, hammer, chalk line, measuring tape,
metal cutting tools - nibblers, drills, hacksaw, utility knife,
pop-rivet gun, caulking guns, layout and combination
square, C clamps, sheet metal shears (including RH, LH,
straight and overhand). Power driven screw gun with
proper bits, depth-setting nosepiece, variable speed.
Choose the correct equipment and tools to do the
job in a safe manner. Wear safety gear and follow
OHSA requirements.
Follow these simple rules:
1. Never cut the panels with an abrasive cut-off wheel or torch, as this will damage the finish.
2. Do not weld the trim or panels.
3. Remove any small burrs left by cutting, screwing or drilling.
4. Remove protective masking immediately after trim and panels are installed.
5. Caution should be taken when handling the panels to prevent damage.
6. Use appropriate screws for the type of underlayment and long enough to fully penetrate and secure the panel.
7. The stored materials should be kept dry.
8. Do not cut on finished roof. Remove all drill spirals, chips and dust immediately.
9. Seal neoprene closures and soft cell foam by applying appropriate sealant to both surfaces.
10. Put appropriate sealant/butyl tape between overlapping trims.
11. Overlap trims in a manner not to impede the flow of water.
©2011 ATAS International, Inc. All rights reserved. Permashake
TM
II is a trademark of ATAS International, Inc. ATAS reserves the right to modify, eliminate and/or change its products without prior notification. ATAS cannot assume any
responsibility for the actual selection, use and/or installation of materials. The structure should be designed and prepared in accordance with local building codes. Warranty not valid without registration. LRD0511 LAT089
Sidewall Detail
1. Install self-adhered roofing underlayment along roof plane
and up sidewall.
2. Install step flashing tight against the sidewall.
3. Install the panel up to the wall. Fasten the panel clip as close
to the wall as possible without penetrating the step flashing.
4. Install the sidewall flashing and fasten in place.
5. If the wall treatment is siding, it should lay over the sidewall
trim. If brick or stucco, a reglet should be used with counter
flashing to seal. Be sure to seal reglet.
Note: Step flashing is designed to drain at the eave. The panel
that is attached to the eave at the gable end should be notched
to allow water to drain out.
Note Regarding Trim Details
The application of flashing and trim requires a detailed approach. Consideration should be given to the roofs geometry and the course it creates for water run-
off. Location of gutters and the use of snow retention systems should also be considered. Proper planning regarding the sequence of material overlap is critical.
Sealants, such as butyl tape and tripolymers, should be used at overlapping trim edges, in conjunction with exposed fasteners and to seal flashings. All fasteners
should be properly tightened and not over driven or at an angle. Fasteners that are too loose can “back out” over time. An over driven fastener may cause a
depression in the material, which becomes a collection point for standing water.
Shed Ridge Detail
1. Install metal shingles up to the shed ridge peak.
Shim panels if necessary as shown at left.
2. Place double sided butyl tape just inside hem of
Shed Ridge Trim. Fit trim to peak. Fasten through tape
and shingle into solid substrate. Use #10 x 2” long
gimlet point screw with ⁄” cast zinc hex washer head
and EPDM washer at 24” o.c.
3. Fasten Shed Ridge Peak Trim to fascia with #10 x 2”
long gimlet point screw with ⁄” cast zinc color
matched hex washer head and EPDM washer at 24” o.c.
WALL COVERING
SELF-ADHERED ROOFING
UNDERLAYMENT
PERMASHAKE II PANEL
SIDEWALL CAP
STEP FLASHING
APPROPRIATE FASTENER
UNDERLAYMENT
2" HEX HEAD SCREW 
SHED RIDGE
PERMASHAKE II PANEL
1 ½" WAFER HEAD SCREW 
ANCHOR CLIP
SHIM
1
Exterior grade #10-16 x 1 ½” wafer head screw
2
#10 x 2” long gimlet point screw with 5/16” cast zinc color matched hex washer head and EPDM washer